{"id":16029,"date":"2022-03-14T14:32:33","date_gmt":"2022-03-14T06:32:33","guid":{"rendered":"https:\/\/www.rakansarawak.com\/v3\/?p=16029"},"modified":"2022-03-14T14:32:55","modified_gmt":"2022-03-14T06:32:55","slug":"jkr-betong-road-projects","status":"publish","type":"post","link":"https:\/\/www2.rakansarawak.com\/?p=16029","title":{"rendered":"JKR Betong Road Projects"},"content":{"rendered":"\n<p class=\"has-drop-cap wp-block-paragraph\">The Public Works Department or <em>Jabatan Kerja Raya<\/em> (JKR) Betong administrative division was formed on 26 March 2002.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The administrative of JKR Betong is headed by Divisional Engineer and assisted by various categories of staffs ranging from professional to support groups.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">JKR Saratok is its administrative district, headed by the District Engineer. <\/p>\n\n\n\n<div class=\"wp-block-image\"><figure class=\"aligncenter size-full is-resized\"><img decoding=\"async\" src=\"https:\/\/www.rakansarawak.com\/v3\/wp-content\/uploads\/2022\/03\/RO-9-1-1-72-2022.jpg\" alt=\"\" class=\"wp-image-16018\" width=\"-256\" height=\"-170\" srcset=\"https:\/\/www2.rakansarawak.com\/wp-content\/uploads\/2022\/03\/RO-9-1-1-72-2022.jpg 900w, https:\/\/www2.rakansarawak.com\/wp-content\/uploads\/2022\/03\/RO-9-1-1-72-2022-600x400.jpg 600w, https:\/\/www2.rakansarawak.com\/wp-content\/uploads\/2022\/03\/RO-9-1-1-72-2022-300x200.jpg 300w, https:\/\/www2.rakansarawak.com\/wp-content\/uploads\/2022\/03\/RO-9-1-1-72-2022-768x512.jpg 768w, https:\/\/www2.rakansarawak.com\/wp-content\/uploads\/2022\/03\/RO-9-1-1-72-2022-150x100.jpg 150w, https:\/\/www2.rakansarawak.com\/wp-content\/uploads\/2022\/03\/RO-9-1-1-72-2022-696x464.jpg 696w, https:\/\/www2.rakansarawak.com\/wp-content\/uploads\/2022\/03\/RO-9-1-1-72-2022-630x420.jpg 630w\" sizes=\"(max-width: 900px) 100vw, 900px\" \/><figcaption>During a recent trip to Betong, RAKAN Sarawak met up with Divisional Engineer of Public Works Department (JKR) of the Division, Chiresly Ak Francis Kureng at the JKR office<\/figcaption><\/figure><\/div>\n\n\n\n<div class=\"wp-block-image\"><figure class=\"aligncenter size-full is-resized\"><img decoding=\"async\" src=\"https:\/\/www.rakansarawak.com\/v3\/wp-content\/uploads\/2022\/03\/RO-9-2-1-72-2022.jpg\" alt=\"\" class=\"wp-image-16019\" width=\"-240\" height=\"-159\" srcset=\"https:\/\/www2.rakansarawak.com\/wp-content\/uploads\/2022\/03\/RO-9-2-1-72-2022.jpg 900w, https:\/\/www2.rakansarawak.com\/wp-content\/uploads\/2022\/03\/RO-9-2-1-72-2022-600x400.jpg 600w, https:\/\/www2.rakansarawak.com\/wp-content\/uploads\/2022\/03\/RO-9-2-1-72-2022-300x200.jpg 300w, https:\/\/www2.rakansarawak.com\/wp-content\/uploads\/2022\/03\/RO-9-2-1-72-2022-768x512.jpg 768w, https:\/\/www2.rakansarawak.com\/wp-content\/uploads\/2022\/03\/RO-9-2-1-72-2022-150x100.jpg 150w, https:\/\/www2.rakansarawak.com\/wp-content\/uploads\/2022\/03\/RO-9-2-1-72-2022-696x464.jpg 696w, https:\/\/www2.rakansarawak.com\/wp-content\/uploads\/2022\/03\/RO-9-2-1-72-2022-630x420.jpg 630w\" sizes=\"(max-width: 900px) 100vw, 900px\" \/><figcaption>Chiresly explaining about the proposed Jalan Ulu Paku\/Ulu Gerenjang\/Ulu Krian\/Ulu Kota (Phase 1) and the proposed Jalan Penom\/Ulu Bayor\/Danau (Phase 1) road projects handled by JKR Betong Division. He noted that both projects will be completed by this year<\/figcaption><\/figure><\/div>\n\n\n\n<div class=\"wp-block-image\"><figure class=\"aligncenter size-full is-resized\"><img decoding=\"async\" src=\"https:\/\/www.rakansarawak.com\/v3\/wp-content\/uploads\/2022\/03\/RO-9-3-1-72-2022.jpg\" alt=\"\" class=\"wp-image-16020\" width=\"-233\" height=\"-155\" srcset=\"https:\/\/www2.rakansarawak.com\/wp-content\/uploads\/2022\/03\/RO-9-3-1-72-2022.jpg 899w, https:\/\/www2.rakansarawak.com\/wp-content\/uploads\/2022\/03\/RO-9-3-1-72-2022-600x400.jpg 600w, https:\/\/www2.rakansarawak.com\/wp-content\/uploads\/2022\/03\/RO-9-3-1-72-2022-300x200.jpg 300w, https:\/\/www2.rakansarawak.com\/wp-content\/uploads\/2022\/03\/RO-9-3-1-72-2022-768x513.jpg 768w, https:\/\/www2.rakansarawak.com\/wp-content\/uploads\/2022\/03\/RO-9-3-1-72-2022-150x100.jpg 150w, https:\/\/www2.rakansarawak.com\/wp-content\/uploads\/2022\/03\/RO-9-3-1-72-2022-696x465.jpg 696w, https:\/\/www2.rakansarawak.com\/wp-content\/uploads\/2022\/03\/RO-9-3-1-72-2022-629x420.jpg 629w\" sizes=\"(max-width: 899px) 100vw, 899px\" \/><figcaption>With a stretch of 6.921 kilometres, the proposed Jalan Ulu Paku\/Ulu Gerenjang\/Ulu Krian\/Ulu Kota road project was reported to be behind schedule due to poor performance of previous contractor<\/figcaption><\/figure><\/div>\n\n\n\n<div class=\"wp-block-image\"><figure class=\"aligncenter size-full is-resized\"><img decoding=\"async\" src=\"https:\/\/www.rakansarawak.com\/v3\/wp-content\/uploads\/2022\/03\/RO-9-4-1-72-2022.jpg\" alt=\"\" class=\"wp-image-16021\" width=\"-226\" height=\"-150\" srcset=\"https:\/\/www2.rakansarawak.com\/wp-content\/uploads\/2022\/03\/RO-9-4-1-72-2022.jpg 900w, https:\/\/www2.rakansarawak.com\/wp-content\/uploads\/2022\/03\/RO-9-4-1-72-2022-600x400.jpg 600w, https:\/\/www2.rakansarawak.com\/wp-content\/uploads\/2022\/03\/RO-9-4-1-72-2022-300x200.jpg 300w, https:\/\/www2.rakansarawak.com\/wp-content\/uploads\/2022\/03\/RO-9-4-1-72-2022-768x512.jpg 768w, https:\/\/www2.rakansarawak.com\/wp-content\/uploads\/2022\/03\/RO-9-4-1-72-2022-150x100.jpg 150w, https:\/\/www2.rakansarawak.com\/wp-content\/uploads\/2022\/03\/RO-9-4-1-72-2022-696x464.jpg 696w, https:\/\/www2.rakansarawak.com\/wp-content\/uploads\/2022\/03\/RO-9-4-1-72-2022-630x420.jpg 630w\" sizes=\"(max-width: 900px) 100vw, 900px\" \/><figcaption>The first of three bridges at Jalan Ulu Paku\/Ulu Gerenjang\/Ulu Krian\/Ulu Kota which is said to be 16 metres long and to be completed by August 2022<\/figcaption><\/figure><\/div>\n\n\n\n<div class=\"wp-block-image\"><figure class=\"aligncenter size-full is-resized\"><img decoding=\"async\" src=\"https:\/\/www.rakansarawak.com\/v3\/wp-content\/uploads\/2022\/03\/RO-9-5-1-72-2022.jpg\" alt=\"\" class=\"wp-image-16022\" width=\"-231\" height=\"-154\" srcset=\"https:\/\/www2.rakansarawak.com\/wp-content\/uploads\/2022\/03\/RO-9-5-1-72-2022.jpg 900w, https:\/\/www2.rakansarawak.com\/wp-content\/uploads\/2022\/03\/RO-9-5-1-72-2022-600x400.jpg 600w, https:\/\/www2.rakansarawak.com\/wp-content\/uploads\/2022\/03\/RO-9-5-1-72-2022-300x200.jpg 300w, https:\/\/www2.rakansarawak.com\/wp-content\/uploads\/2022\/03\/RO-9-5-1-72-2022-768x512.jpg 768w, https:\/\/www2.rakansarawak.com\/wp-content\/uploads\/2022\/03\/RO-9-5-1-72-2022-150x100.jpg 150w, https:\/\/www2.rakansarawak.com\/wp-content\/uploads\/2022\/03\/RO-9-5-1-72-2022-696x464.jpg 696w, https:\/\/www2.rakansarawak.com\/wp-content\/uploads\/2022\/03\/RO-9-5-1-72-2022-630x420.jpg 630w\" sizes=\"(max-width: 900px) 100vw, 900px\" \/><figcaption>The second project, Jalan Penom\/Ulu Bayor\/Danau is also reoorted to be 45 per cent behind schedule due to land acquisition (land resolved), Covid-19 pandemic, weather issue, insufficient machineries and poor performance of sub-contractors at the early stage<\/figcaption><\/figure><\/div>\n\n\n\n<div class=\"wp-block-image\"><figure class=\"aligncenter size-full is-resized\"><img decoding=\"async\" src=\"https:\/\/www.rakansarawak.com\/v3\/wp-content\/uploads\/2022\/03\/RO-9-6-1-72-2022.jpg\" alt=\"\" class=\"wp-image-16023\" width=\"-225\" height=\"-150\" srcset=\"https:\/\/www2.rakansarawak.com\/wp-content\/uploads\/2022\/03\/RO-9-6-1-72-2022.jpg 900w, https:\/\/www2.rakansarawak.com\/wp-content\/uploads\/2022\/03\/RO-9-6-1-72-2022-600x400.jpg 600w, https:\/\/www2.rakansarawak.com\/wp-content\/uploads\/2022\/03\/RO-9-6-1-72-2022-300x200.jpg 300w, https:\/\/www2.rakansarawak.com\/wp-content\/uploads\/2022\/03\/RO-9-6-1-72-2022-768x512.jpg 768w, https:\/\/www2.rakansarawak.com\/wp-content\/uploads\/2022\/03\/RO-9-6-1-72-2022-150x100.jpg 150w, https:\/\/www2.rakansarawak.com\/wp-content\/uploads\/2022\/03\/RO-9-6-1-72-2022-696x464.jpg 696w, https:\/\/www2.rakansarawak.com\/wp-content\/uploads\/2022\/03\/RO-9-6-1-72-2022-630x420.jpg 630w\" sizes=\"(max-width: 900px) 100vw, 900px\" \/><figcaption>With a stretch of 7.43 metre in length and 4.5 metres in width, the scope of work for Jalan Penom\/Ulu Bayor\/Danau includes drainage and bridge work of 36 metre in length and 3.7 metre in width<\/figcaption><\/figure><\/div>\n<div style='text-align:center' class='yasr-auto-insert-visitor'><!--Yasr Visitor Votes Shortcode--><div id='yasr_visitor_votes_8c791d3aa6468' class='yasr-visitor-votes'><div class=\"yasr-custom-text-vv-before yasr-custom-text-vv-before-16029\">Click to rate this post!<\/div><div id='yasr-vv-second-row-container-8c791d3aa6468'\r\n                                        class='yasr-vv-second-row-container'><div id='yasr-visitor-votes-rater-8c791d3aa6468'\r\n                                      class='yasr-rater-stars-vv'\r\n                                      data-rater-postid='16029'\r\n                                      data-rating='0'\r\n                                      data-rater-starsize='16'\r\n                                      data-rater-readonly='true'\r\n                                      data-rater-nonce='fd54b5f403'\r\n                                      data-issingular='false'\r\n                                    ><\/div><div class=\"yasr-vv-stats-text-container\" id=\"yasr-vv-stats-text-container-8c791d3aa6468\"><svg xmlns=\"https:\/\/www.w3.org\/2000\/svg\" width=\"20\" height=\"20\"\r\n                                   class=\"yasr-dashicons-visitor-stats\"\r\n                                   data-postid=\"16029\"\r\n                                   id=\"yasr-stats-dashicon-8c791d3aa6468\">\r\n                                   <path d=\"M18 18v-16h-4v16h4zM12 18v-11h-4v11h4zM6 18v-8h-4v8h4z\"><\/path>\r\n                               <\/svg><span id=\"yasr-vv-text-container-8c791d3aa6468\" class=\"yasr-vv-text-container\">[Total: <span id=\"yasr-vv-votes-number-container-8c791d3aa6468\">0<\/span>  Average: <span id=\"yasr-vv-average-container-8c791d3aa6468\">0<\/span>]<\/span><\/div><div id='yasr-vv-loader-8c791d3aa6468' class='yasr-vv-container-loader'><\/div><\/div><div id='yasr-vv-bottom-container-8c791d3aa6468' class='yasr-vv-bottom-container'><div class='yasr-small-block-bold'><span class='yasr-visitor-votes-must-sign-in'>You must sign in to vote<\/span><\/div><\/div><\/div><!--End Yasr Visitor Votes Shortcode--><\/div>","protected":false},"excerpt":{"rendered":"<p>The second project, Jalan Penom\/Ulu Bayor\/Danau is also reported to be 45 per cent behind schedule due to land acquisition (land resolved), Covid-19 pandemic, weather issue, insufficient machineries and poor performance of sub-contractors at the early stage<\/p>\n","protected":false},"author":960,"featured_media":16022,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"yasr_overall_rating":0,"yasr_post_is_review":"","yasr_auto_insert_disabled":"","yasr_review_type":"","footnotes":""},"categories":[23,37],"tags":[316,1000,1894],"class_list":["post-16029","post","type-post","status-publish","format-standard","has-post-thumbnail","category-from-rakan-sarawak","category-development-updates","tag-betong","tag-jkr","tag-road"],"acf":[],"yasr_visitor_votes":{"stars_attributes":{"read_only":true,"span_bottom":"<div class='yasr-small-block-bold'><span class='yasr-visitor-votes-must-sign-in'>You must sign in to vote<\/span><\/div>"},"number_of_votes":0,"sum_votes":0},"publishpress_future_action":{"enabled":false,"date":"2026-09-04 23:21:39","action":"change-status","newStatus":"draft","terms":[],"taxonomy":"category","extraData":[]},"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/www2.rakansarawak.com\/index.php?rest_route=\/wp\/v2\/posts\/16029","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www2.rakansarawak.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www2.rakansarawak.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www2.rakansarawak.com\/index.php?rest_route=\/wp\/v2\/users\/960"}],"replies":[{"embeddable":true,"href":"https:\/\/www2.rakansarawak.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=16029"}],"version-history":[{"count":2,"href":"https:\/\/www2.rakansarawak.com\/index.php?rest_route=\/wp\/v2\/posts\/16029\/revisions"}],"predecessor-version":[{"id":16032,"href":"https:\/\/www2.rakansarawak.com\/index.php?rest_route=\/wp\/v2\/posts\/16029\/revisions\/16032"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www2.rakansarawak.com\/index.php?rest_route=\/wp\/v2\/media\/16022"}],"wp:attachment":[{"href":"https:\/\/www2.rakansarawak.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=16029"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www2.rakansarawak.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=16029"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www2.rakansarawak.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=16029"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}