{"id":2373,"date":"2007-03-02T00:00:00","date_gmt":"2007-03-02T00:00:00","guid":{"rendered":"http:\/\/localhost\/wordpress\/2007\/03\/02\/sdos-projects-in-miri-and-the-baram\/"},"modified":"2007-03-02T00:00:00","modified_gmt":"2007-03-02T00:00:00","slug":"sdos-projects-in-miri-and-the-baram","status":"publish","type":"post","link":"https:\/\/www2.rakansarawak.com\/?p=2373","title":{"rendered":"SDO&apos;s Projects in Miri and the Baram"},"content":{"rendered":"<p class=&quot;MsoBodyTextIndent&quot; style=&quot;text-align: justify; text-indent: 0in;&quot; align=&quot;justify&quot;><font face=&quot;Arial, Helvetica, sans-serif&quot; size=&quot;2&quot;><span lang=&quot;EN-GB&quot;>Success stories in the arena of developing Sarawak evoke a sense of<br \/>\npride and unity amongst the people of this great state, even more so as the<br \/>\ntargeted focus of 2020 is close towards becoming a reality. The year of 2006<br \/>\nbrought a success rate of 98 percent for the State Development Office\u2019s<br \/>\n(SDO) projects that were implemented in the areas of Miri and the Baram.<\/span><\/font><\/p>\n<div align=&quot;justify&quot;>\n<\/div>\n<h2 style=&quot;text-indent: 0in;&quot; align=&quot;justify&quot;><font face=&quot;Arial, Helvetica, sans-serif&quot; size=&quot;2&quot;><span lang=&quot;EN-GB&quot;>Public Infrastructure Maintenance<br \/>\n(PIA) Projects<\/span><span style=&quot;font-weight: normal;&quot; lang=&quot;EN-GB&quot;><o:p><\/o:p><\/span><\/font><\/h2>\n<div align=&quot;justify&quot;>\n<\/div>\n<p class=&quot;MsoBodyTextIndent2&quot; style=&quot;text-indent: 0in;&quot; align=&quot;justify&quot;><font face=&quot;Arial, Helvetica, sans-serif&quot; size=&quot;2&quot;><span lang=&quot;EN-GB&quot;>The job<br \/>\nscope of the PIA projects that were carried out in 2006 included infrastructure<br \/>\nmaintenance and quality-improving measures towards government buildings,<br \/>\nincluding:<\/span><\/font><\/p>\n<div align=&quot;justify&quot;>\n<\/div>\n<ul>\n<li><font face=&quot;Arial, Helvetica, sans-serif&quot; size=&quot;2&quot;><span lang=&quot;EN-GB&quot;>The repairing of<br \/>\nfences, guard houses, entrance\/exit ways, floors, walls, roofs, rain-water<br \/>\nflowage systems, toilets, water pipe systems, drains, sewage systems and roads<\/span><\/font><font face=&quot;Arial, Helvetica, sans-serif&quot; size=&quot;2&quot;><span lang=&quot;EN-GB&quot;><\/span><\/font><\/li>\n<li><font face=&quot;Arial, Helvetica, sans-serif&quot; size=&quot;2&quot;><span lang=&quot;EN-GB&quot;>The<br \/>\nrepairing\/rewiring of electrical systems (excluding air conditioners)<\/span><\/font><\/li>\n<\/ul>\n<div align=&quot;justify&quot;>\n<\/div>\n<div align=&quot;justify&quot;>\n<\/div>\n<p class=&quot;MsoNormal&quot; style=&quot;text-align: justify;&quot; align=&quot;justify&quot;><font face=&quot;Arial, Helvetica, sans-serif&quot; size=&quot;2&quot;><span lang=&quot;EN-GB&quot;>The objectives<br \/>\nof these projects were to repair and restore the government-owned buildings and<br \/>\nfacilities so as to provide the utmost comfort for its users, noting the importance<br \/>\nof quality maintenance. The overall total cost of the 2006 PIA projects in Miri<br \/>\nand the Baram reached RM 10.666 million.<\/span><\/font><\/p>\n<div align=&quot;justify&quot;>\n<\/div>\n<h2 style=&quot;text-indent: 0in;&quot; align=&quot;justify&quot;><font face=&quot;Arial, Helvetica, sans-serif&quot; size=&quot;2&quot;><span lang=&quot;EN-GB&quot;>Rural Basic Infrastructure<br \/>\nDevelopment (PIAS) Projects<\/span><\/font><\/h2>\n<div align=&quot;justify&quot;>\n<\/div>\n<p class=&quot;MsoNormal&quot; align=&quot;justify&quot;><font face=&quot;Arial, Helvetica, sans-serif&quot; size=&quot;2&quot;><span lang=&quot;EN-GB&quot;>The PIAS projects that were carried out in<br \/>\n2006 included:<\/span><\/font><\/p>\n<div align=&quot;justify&quot;>\n<\/div>\n<ul>\n<li><font face=&quot;Arial, Helvetica, sans-serif&quot; size=&quot;2&quot;><span lang=&quot;EN-GB&quot;>The construction, repairing and<br \/>\nimprovement of small bridges, culverts\/gabions, small jetties, drains and<br \/>\nvillage and plantation roads<\/span><\/font><\/li>\n<\/ul>\n<div align=&quot;justify&quot;>\n<\/div>\n<p class=&quot;MsoBodyTextIndent3&quot; style=&quot;text-indent: 0in;&quot; align=&quot;justify&quot;><font face=&quot;Arial, Helvetica, sans-serif&quot; size=&quot;2&quot;><span lang=&quot;EN-GB&quot;>The<br \/>\nobjective of these projects was to provide the people of Miri and the Baram<br \/>\nwith basic infrastructure amenities. The 2006 PIAS projects in these areas<br \/>\ntotalled to RM 10.433 million. <\/span><\/font><\/p>\n<div align=&quot;justify&quot;>\n<\/div>\n<p class=&quot;MsoNormal&quot; style=&quot;text-align: justify;&quot; align=&quot;justify&quot;><font face=&quot;Arial, Helvetica, sans-serif&quot; size=&quot;2&quot;><span lang=&quot;EN-GB&quot;>Let us hope that<br \/>\n2007 will bring even more developmental success in Miri and the Baram,<br \/>\nsubsequently bringing forth the realisation of the 9<sup>th<\/sup> Malaysia Plan<br \/>\n(9MP) for Sarawak.<\/span><\/font><\/p>\n<p class=&quot;MsoNormal&quot;><font face=&quot;Arial, Helvetica, sans-serif&quot; size=&quot;2&quot;><span lang=&quot;EN-GB&quot;>A total of 305 projects were implemented,<br \/>\nwith the breakdown of projects as seen in the following:<\/span><\/font><\/p>\n<p class=&quot;MsoNormal&quot;><font face=&quot;Arial, Helvetica, sans-serif&quot; size=&quot;2&quot;><span lang=&quot;EN-GB&quot;><\/p>\n<table align=&quot;&quot; border=&quot;0&quot; cellpadding=&quot;1&quot; cellspacing=&quot;1&quot; width=&quot;100%&quot;>\n<tbody>\n<tr>\n<td><u><b>Miri<br \/><\/b><\/u><\/td>\n<td align=&quot;center&quot;><u><br \/><\/u><\/td>\n<td align=&quot;center&quot;><u><br \/><\/u><\/td>\n<\/tr>\n<tr>\n<td><u><b><span style=&quot;font-size: 10pt; font-family: Arial;&quot; lang=&quot;EN-GB&quot;>Type of Project<\/span><\/b><\/u><\/td>\n<td align=&quot;center&quot;><u><b><span style=&quot;font-size: 10pt; font-family: Arial;&quot; lang=&quot;EN-GB&quot;>Total Number of Projects<\/span><\/b><\/u><\/td>\n<td align=&quot;center&quot;><u><b><span style=&quot;font-size: 10pt; font-family: Arial;&quot; lang=&quot;EN-GB&quot;>Total Cost of Projects <\/span><\/b><\/u><\/td>\n<\/tr>\n<tr>\n<td><span style=&quot;font-size: 10pt; font-family: Arial;&quot; lang=&quot;EN-GB&quot;>Public Infrastructure<br \/>\nMaintenance (PIA) Projects<\/span><\/td>\n<td align=&quot;center&quot;><span style=&quot;font-size: 10pt; font-family: Arial;&quot; lang=&quot;EN-GB&quot;>135<\/span><\/td>\n<td align=&quot;center&quot;><span style=&quot;font-size: 10pt; font-family: Arial;&quot; lang=&quot;EN-GB&quot;>RM 7.81 million<\/span><\/td>\n<\/tr>\n<tr>\n<td><span style=&quot;font-size: 10pt; font-family: Arial;&quot; lang=&quot;EN-GB&quot;>Rural Basic Infrastructure<br \/>\nDevelopment (PIAS) Projects<\/span><\/td>\n<td align=&quot;center&quot;><span style=&quot;font-size: 10pt; font-family: Arial;&quot; lang=&quot;EN-GB&quot;>67<\/span><\/td>\n<td align=&quot;center&quot;><span style=&quot;font-size: 10pt; font-family: Arial;&quot; lang=&quot;EN-GB&quot;>RM 7.917 million<\/span><\/td>\n<\/tr>\n<tr>\n<td><\/td>\n<td align=&quot;center&quot;><\/td>\n<td align=&quot;center&quot;><\/td>\n<\/tr>\n<tr>\n<td valign=&quot;top&quot;><b><span style=&quot;font-size: 10pt; font-family: Arial;&quot; lang=&quot;EN-GB&quot;>Baram<\/span><\/b><\/td>\n<td valign=&quot;top&quot;><\/td>\n<td valign=&quot;top&quot;><\/td>\n<\/tr>\n<tr>\n<td valign=&quot;top&quot;><font face=&quot;Arial, Helvetica, sans-serif&quot; size=&quot;2&quot;><span lang=&quot;EN-GB&quot;><u><b><span style=&quot;font-size: 10pt; font-family: Arial;&quot; lang=&quot;EN-GB&quot;>Type of Project<\/span><\/b><\/u><\/span><\/font><\/td>\n<td align=&quot;center&quot; valign=&quot;top&quot;><font face=&quot;Arial, Helvetica, sans-serif&quot; size=&quot;2&quot;><span lang=&quot;EN-GB&quot;><u><b><span style=&quot;font-size: 10pt; font-family: Arial;&quot; lang=&quot;EN-GB&quot;>Total Number of Projects<\/span><\/b><\/u><\/span><\/font><\/td>\n<td align=&quot;center&quot; valign=&quot;top&quot;><font face=&quot;Arial, Helvetica, sans-serif&quot; size=&quot;2&quot;><span lang=&quot;EN-GB&quot;><u><b><span style=&quot;font-size: 10pt; font-family: Arial;&quot; lang=&quot;EN-GB&quot;>Total Cost of Projects<\/span><\/b><\/u><\/span><\/font><\/td>\n<\/tr>\n<tr>\n<td valign=&quot;top&quot;><font face=&quot;Arial, Helvetica, sans-serif&quot; size=&quot;2&quot;><span lang=&quot;EN-GB&quot;><span style=&quot;font-size: 10pt; font-family: Arial;&quot; lang=&quot;EN-GB&quot;>Public Infrastructure<br \/>\nMaintenance (PIA) Projects<\/span><\/span><\/font><\/td>\n<td align=&quot;center&quot; valign=&quot;top&quot;><span style=&quot;font-size: 10pt; font-family: Arial;&quot; lang=&quot;EN-GB&quot;>71<\/span><\/td>\n<td align=&quot;center&quot; valign=&quot;top&quot;><span style=&quot;font-size: 10pt; font-family: Arial;&quot; lang=&quot;EN-GB&quot;>RM 2.856 million<\/span><\/td>\n<\/tr>\n<tr>\n<td valign=&quot;top&quot;><font face=&quot;Arial, Helvetica, sans-serif&quot; size=&quot;2&quot;><span lang=&quot;EN-GB&quot;><\/span><\/font><\/p>\n<table align=&quot;&quot; border=&quot;0&quot; cellpadding=&quot;1&quot; cellspacing=&quot;1&quot; width=&quot;100%&quot;>\n<tbody>\n<tr>\n<td><span style=&quot;font-size: 10pt; font-family: Arial;&quot; lang=&quot;EN-GB&quot;>Rural Basic Infrastructure<br \/>\nDevelopment (PIAS) Projects<\/span><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/td>\n<td align=&quot;center&quot; valign=&quot;top&quot;><span style=&quot;font-size: 10pt; font-family: Arial;&quot; lang=&quot;EN-GB&quot;>32<\/span><\/td>\n<td align=&quot;center&quot; valign=&quot;top&quot;><span style=&quot;font-size: 10pt; font-family: Arial;&quot; lang=&quot;EN-GB&quot;>RM 2.516 million<\/span><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p><\/span><\/font><font face=&quot;Arial, Helvetica, sans-serif&quot; size=&quot;2&quot;><span lang=&quot;EN-GB&quot;><\/span><\/font><\/p>\n<p class=&quot;MsoNormal&quot;><font face=&quot;Arial, Helvetica, sans-serif&quot; size=&quot;2&quot;><span lang=&quot;EN-GB&quot;><\/p>\n<table align=&quot;&quot; border=&quot;0&quot; cellpadding=&quot;1&quot; cellspacing=&quot;1&quot; width=&quot;100%&quot;>\n<tbody>\n<tr>\n<td><font size=&quot;1&quot;><span style=&quot;font-size: 10pt; font-family: Arial;&quot; lang=&quot;EN-GB&quot;><img src=&quot;http:\/\/www.faradalemedia.com\/newsphoto\/ahad\/Baram31.jpg&quot; border=&quot;&quot; height=&quot;162&quot; width=&quot;216&quot;><\/span><\/font><\/td>\n<td>\n<table align=&quot;&quot; border=&quot;0&quot; cellpadding=&quot;1&quot; cellspacing=&quot;1&quot; width=&quot;100%&quot;>\n<tbody>\n<tr>\n<td><font size=&quot;1&quot;><img src=&quot;http:\/\/www.faradalemedia.com\/newsphoto\/ahad\/Baram41.jpg&quot; border=&quot;&quot; height=&quot;162&quot; width=&quot;216&quot;><\/font><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/td>\n<\/tr>\n<tr>\n<td><span style=&quot;font-size: 10pt; font-family: Arial;&quot; lang=&quot;EN-GB&quot;>The reinforcement of a<br \/>\nconcrete step-down slope in Kampung Long Moh, Baram <\/span><\/td>\n<td><span style=&quot;font-size: 10pt; font-family: Arial;&quot; lang=&quot;EN-GB&quot;>The newly completed belian<br \/>\nbridge of SK Buri, Bakong, Baram<\/span><\/td>\n<\/tr>\n<tr>\n<td>\n<table align=&quot;&quot; border=&quot;0&quot; cellpadding=&quot;1&quot; cellspacing=&quot;1&quot; width=&quot;100%&quot;>\n<tbody>\n<tr>\n<td><font size=&quot;1&quot;><img src=&quot;http:\/\/www.faradalemedia.com\/newsphoto\/ahad\/Baram51.jpg&quot; border=&quot;&quot; height=&quot;162&quot; width=&quot;216&quot;><\/font><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/td>\n<td>\n<table align=&quot;&quot; border=&quot;0&quot; cellpadding=&quot;1&quot; cellspacing=&quot;1&quot; width=&quot;100%&quot;>\n<tbody>\n<tr>\n<td><font size=&quot;1&quot;><img src=&quot;http:\/\/www.faradalemedia.com\/newsphoto\/ahad\/Baram61.jpg&quot; border=&quot;&quot; height=&quot;162&quot; width=&quot;216&quot;><\/font><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p class=&quot;MsoNormal&quot;><font face=&quot;Arial, Helvetica, sans-serif&quot; size=&quot;2&quot;><span lang=&quot;EN-GB&quot;><font face=&quot;Arial, Helvetica, sans-serif&quot; size=&quot;2&quot;><span lang=&quot;EN-GB&quot;><span style=&quot;font-size: 10pt; font-family: Arial;&quot; lang=&quot;EN-GB&quot;>Making way for a connecting gravel road from Kampung Tiris to Kampung Rancah-Rancah, Miri<\/span><\/span><\/font><\/span><\/font><\/p>\n<\/td>\n<td><span style=&quot;font-size: 10pt; font-family: Arial;&quot; lang=&quot;EN-GB&quot;>The completed Kampung<br \/>\nTiris-Kampung Rancah-Rancah gravel road<\/span><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p><\/span><\/font><\/p>\n<div style='text-align:center' class='yasr-auto-insert-visitor'><!--Yasr Visitor Votes Shortcode--><div id='yasr_visitor_votes_30c3bd6f632ac' class='yasr-visitor-votes'><div class=\"yasr-custom-text-vv-before yasr-custom-text-vv-before-2373\">Click to rate this post!<\/div><div id='yasr-vv-second-row-container-30c3bd6f632ac'\r\n                                        class='yasr-vv-second-row-container'><div id='yasr-visitor-votes-rater-30c3bd6f632ac'\r\n                                      class='yasr-rater-stars-vv'\r\n                                      data-rater-postid='2373'\r\n                                      data-rating='0'\r\n                                      data-rater-starsize='16'\r\n                                      data-rater-readonly='true'\r\n                                      data-rater-nonce='578d1b4125'\r\n                                      data-issingular='false'\r\n                                    ><\/div><div class=\"yasr-vv-stats-text-container\" id=\"yasr-vv-stats-text-container-30c3bd6f632ac\"><svg xmlns=\"https:\/\/www.w3.org\/2000\/svg\" width=\"20\" height=\"20\"\r\n                                   class=\"yasr-dashicons-visitor-stats\"\r\n                                   data-postid=\"2373\"\r\n                                   id=\"yasr-stats-dashicon-30c3bd6f632ac\">\r\n                                   <path d=\"M18 18v-16h-4v16h4zM12 18v-11h-4v11h4zM6 18v-8h-4v8h4z\"><\/path>\r\n                               <\/svg><span id=\"yasr-vv-text-container-30c3bd6f632ac\" class=\"yasr-vv-text-container\">[Total: <span id=\"yasr-vv-votes-number-container-30c3bd6f632ac\">0<\/span>  Average: <span id=\"yasr-vv-average-container-30c3bd6f632ac\">0<\/span>]<\/span><\/div><div id='yasr-vv-loader-30c3bd6f632ac' class='yasr-vv-container-loader'><\/div><\/div><div id='yasr-vv-bottom-container-30c3bd6f632ac' class='yasr-vv-bottom-container'><div class='yasr-small-block-bold'><span class='yasr-visitor-votes-must-sign-in'>You must sign in to vote<\/span><\/div><\/div><\/div><!--End Yasr Visitor Votes Shortcode--><\/div>","protected":false},"excerpt":{"rendered":"<p>Success stories in the arena of developing Sarawak evoke a sense of pride and unity amongst the people of this great state, even more so as the targeted focus of 2020 is close towards becoming a reality. The year of 2006 brought a success rate of 98 percent for the State Development Office\u2019s (SDO) projects [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"yasr_overall_rating":0,"yasr_post_is_review":"","yasr_auto_insert_disabled":"","yasr_review_type":"","footnotes":""},"categories":[2],"tags":[3167],"class_list":{"0":"post-2373","1":"post","2":"type-post","3":"status-publish","4":"format-standard","6":"category-featured","7":"tag-dari-sematan-ke-merapok"},"acf":[],"yasr_visitor_votes":{"stars_attributes":{"read_only":true,"span_bottom":"<div class='yasr-small-block-bold'><span class='yasr-visitor-votes-must-sign-in'>You must sign in to vote<\/span><\/div>"},"number_of_votes":0,"sum_votes":0},"publishpress_future_action":{"enabled":false,"date":"2026-05-26 10:12:03","action":"change-status","newStatus":"draft","terms":[],"taxonomy":"category","extraData":[]},"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/www2.rakansarawak.com\/index.php?rest_route=\/wp\/v2\/posts\/2373","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www2.rakansarawak.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www2.rakansarawak.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www2.rakansarawak.com\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www2.rakansarawak.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=2373"}],"version-history":[{"count":0,"href":"https:\/\/www2.rakansarawak.com\/index.php?rest_route=\/wp\/v2\/posts\/2373\/revisions"}],"wp:attachment":[{"href":"https:\/\/www2.rakansarawak.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=2373"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www2.rakansarawak.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=2373"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www2.rakansarawak.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=2373"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}